Description
NOICE BLOCKER BLUE INSTALLATION INSTRUCTIONS
- The sub-floor must be level, dry and clean.
- From the room corner start to roll-out the underlay, vapour barrier side downwards; allowing the pad to run up the exterior walls 1/2″.
- Roll out the second row of underlay along-side the first.
- Be sure the edges of rows are aligned together as tightly as possible without over-lapping.
- Repeat steps until installation is complete.
Have A Question?
+1 778 707 1730 ||
in**@ev***************.ca